Skip to main content

Life in Singapore: Portraits in the Site Office

I found out that working in the office is quite boring and decide to be taken photo by Nathan assistant. We rushed to make some and blogged it as soon as it was made. I made several posts however he took only in my face. But anyway, these are nice pictures. That’s why I decided to shear with you all.


I was standing outside of the side office. I was made need the office canteen for workers.


It was taken in the meeting room. You can see some drawings of my project as my background. You may notice that my hairs are starting loosing.


It’s me with a site staff helmet. To let you know office personnel wears white, labor wears yellow, lifting supervisor wears red and Safety supervisor wears blue helmet respectively.


It’s me again. This time we used the entrance door as background.

Comments

Popular posts from this blog

BIM (Building Information Modeling) မိတ်ဆက်

အခုအချိန်တွင် BIM ဆိုတဲ့ စကားလုံးကို ဆောက်လုပ်ရေးလောကမှာ အတော်များများ ပြောသံဆိုသံတွေ ကြားလာကြတယ်။ ဒါကြောင့် BIM ဘာကြီးမှန်း သိဖို့နဲ့ ဘယ်သူတွေက ဘယ်ကိစ္စတွေမှာ သုံးနေတယ် သုံးကြတယ် ဆိုတာကို အတိအကျသိဖို့ လိုပါလိမ့်မယ်။ တစ်ချို့က BIM သည် software တစ်မျိုးလို့ပြောတယ်။ တစ်ချို့က BIM သည် အဆောက်အဦးတွေရဲ့ 3D model လို့ဆိုကြပြန်တယ်။ တစ်ခြားလူတွေက BIM ဆိုတာ အဆောက်အဦးနဲ့ ပတ်သက်တဲ့ အချက်အလက်တွေ အကုန်လုံးကို သေသေခြာစုဆောင်း ပေးနိုင်တဲ့ လုပ်ငန်းစဉ် တစ်ခုလို့ ရှုင်းပြကြပြန်တယ်။ တစ်ကယ်တော့ BIM ဆိုတာ ခုနကပြောခဲ့တဲ့ အကြောင်းအရာတွေ အကုန်လုံးထက် အများကြီးကိုပိုသ ပြီးလုပ်ဆောင်ပေးနိုင် ပါသေးတယ်။  သာမန်လူတစ်​ေယာက်၊ ဆောက်လုပ်ရေးလောက ပြင်ပကလူတစ်ယောက် နားလည်အောင် ရှင်းပြရရင် BIM ဆိုတာဖြစ်လာဖို့ အတွက် digital 3D model ကို စပြီးတည်ဆောက်ရတယ်။ အဲဒီ model က သာမန် 3D model ထက်ပိုပြီး အခက်အလက်တွေကို ထည့်သွင်း ဖေါ်ပြတယ်။ ဆိုကြပါစို့ လှပပြီး စိတ်ဝင်စား စရာကောင်းတဲ့ နံရံတွေရဲ့ ဆေးရောင်တွေ၊ texture တွေ ကိုတစ်ပါတည်း ထည့်သွင်းဖေါ်ပြလို့ရပါတယ်။ BIM model တစ်ခု ဖြစ်လာဖို့ဆိုရင် တစ်ကယ့်အဆောက်အဦးမှာ ပါတယ့် စိတ်အပိုင်းတွေ အက...

Building procurement method: Management

Management Management procurement is a method where construction work is completed using a series of separate works or trade contracts which the main contractor is responsible for managing. The contractor does not actually do the physical work, but is paid a sum for managing the project through the various works packages. The employer starts by appointing consultants and a contract administrator to prepare drawings, a project specification and cost plan. The employer has control over design throughout the project through their professional team. The contractor is appointed by negotiaiton or tender, and interview. The works packages are usually let by competitive tender. It is beneficial for the proposed contractor to be involved as early as possible as they will provide expertise in terms of buildability and programming of the works packages. Other features of management procurement Design can proceed in parallel with construction, and much of the design might be of a specialist ...